The Following areas will be shut down on Thursday 8/6/12 at approximately 8:00AM due to construction. The interruption should be 8 to 8.5 hours:
- River St. – Concord River to Town Center
- Colonial Dr.
- Parker St.
- Wedgewood Av.
Refer all questions to Water Treatment at 978-671-0957